• Pedestal Stand & Cable Management for EVC Chargers
  • Made from galvanized iron
  • Includes mounting hardware in box
View Technical Specs
Dimensions
Link to Dimension Drawing

Weight: 11.0 lbs

Technical Specifications
Product Overview
Product Type
Cable Management Add-On for EV Charger
Application
Commercial & public use
Construction
Housing Material
Galvanized iron
Installation
Mounting
Mounts driectly on top of EVP pedestal which allows addition of EVR retractors for cable management
Mounting Hardware Included
Yes
Other
Compatible Accessories
EVC48
EVC48/ND

EVC48/LCB
EVC40/LCB

EVC40
EVC33
3-Year Limited Warranty
Electric Vehicle Charger products will be free from defects in materials and workmanship for a period of (3) years from the date of original sale to RAB's distributor. The product shall be considered defective only if it cannot be brought back to service by assistance from RAB technical product support representative. If you have a technical issue or question regarding warranty, call our technical support team at RAB Help line. Exceptions apply as stated on product specification sheets incorporated herein by reference. Defects in material or workmanship do not include improper installation or operation, alterations, power surges or overheating due to external conditions. Defects caused by acts of vandalism and incidents beyond control of manufacturer resulting in inoperability of the electric vehicle charger are not covered by the material or workmanship warranty.

Recently Viewed Products

 This is a link to the product EVM EVM
Cable Management Add-On W/O Retractors For Evc Charger
 This is a link to the product DISK-6/PIR DISK-6/PIR
6" Disk Round 12W Cri90 27/30/35/40/50 Cct W/Pir
 This is a link to the product PIR20/LCB PIR20/LCB
Lc Blue Low Ceiling Low Voltage Luminaire Controller With Pir White
 This is a link to the product TM-5T900N TM-5T900N
Totem High Mast 900/810/720/630/540/450/360/225W 4000K T5 120-277V Pole Bronze
 This is a link to the product GUS4/LCBS/MVS/E GUS4/LCBS/MVS/E
Gus 4Ft 50/40/30W 3000/3500/4000/5000/6500K Lcblue Microwave Occupancy Sensor Battery Backup White
 This is a link to the product A34T5LW A34T5LW
A34-L T5 250/200/150W 3000K/4000K/5000K Pole Mount White
 This is a link to the product EVM EVM
Cable Management Add-On W/O Retractors For Evc Charger
 This is a link to the product DISK-6/PIR DISK-6/PIR
6" Disk Round 12W Cri90 27/30/35/40/50 Cct W/Pir
 This is a link to the product PIR20/LCB PIR20/LCB
Lc Blue Low Ceiling Low Voltage Luminaire Controller With Pir White
 This is a link to the product TM-5T900N TM-5T900N
Totem High Mast 900/810/720/630/540/450/360/225W 4000K T5 120-277V Pole Bronze
Link to Live Chat

Contact us

A RAB support representative will respond soon.

Send a message
Link to Lighting Design

Lighting Design

Our lighting designers can help you create a custom layout.

Request Lighting Layout
Link to Where to Buy

Where to Buy

Find a distributor or RAB Sales Representative.

Go to Locator